Details | Scheduled Load Reduction Program


Funder

 

Pacific Gas and Electric

Implementer

 

Pacific Gas and Electric

Description

 

The Scheduled Load Reduction Program (SLRP) pays the customer to reduce their electric load during pre-selected time periods that the customer specifies in advance. The customer selects the time period, the weekdays and the load reduction. To receive the incentive, the customer must reduce their load by this committed load reduction during their selected time period on their selected weekdays. To be eligible to enroll, the customer must have a minimum average monthly demand of 100 kW and be billed on one of the following electric rate schedules: A-10, A-10 TOU, E-19 (including voluntary) or E-20. The customer selects one to three, four-hour time period (between 8 a.m. to 8 p.m.) on one or more weekdays, and are required to reduce load each and every time the selected SLRP options (day of the week and corresponding elected time) occur. The load reduction cannot be shifted to an on-peak time period (0on to 6 p.m.) on another day. The committed load reduction must be at least 15 percent of their average monthly demand or 100 kW, whichever is greater. Load reductions are measured relative to a baseline that is specific to the customer facility. This baseline is the specific facility's average load during the customer selected time period(s) on the previous 10 weekdays excluding days when they were paid to reduce load. Once enrolled, the customer may adjust your committed load reduction, alter their curtailment schedule or discontinue participation once each year during the month of November. The customer will receive a regular reminder of the scheduled load reduction in advance through InterAct, Pacific Gas and Electric's Internet-based energy management system.

Funding guidance

 

Applications open

 

None

Applications close

 

None

Type

 

Rebate and Technical Assistance

Category

 

Funding

Territory

 

Pacific Gas and Electric

Applicant type

 

For Profit  |  Non Profit  |  Public Agency

Project

 

New Addition to an Existing Building  |  Rehabilitation of Existing Whole Building  |  Rehabilitation of Part of an Existing Building  |  Whole New Building Construction

Sector

 

Agricultural  |  Commercial  |  Industrial  |  Public

Sub-sector

 

City  |  Commercial  |  County  |  Data Center  |  Education  |  Health Care  |  Hospitatlity  |  Industrial  |  Multi Family  |  Retail  |  Single Family  |  Special Districts  |  State

Sustainability

 

Energy Efficiency in Buildings

Small business

 

False

Disadvantaged communities

 

False

Cost sharing amount

 

None

Cost sharing percent

 

None

Cost sharing note

 

Minimum repayment years

 

None

Maximum repayment years

 

None

Interest rate comment

 

Incentive